ScopeMatrix
Project progress
A cockpit that tracks the progress of the whole undertaking.
Layer 0 of the application stack
Scope, capacity and economics
The investment-readiness cockpit and the project’s versioned scope. Capacity, economics, localization, permitting and risk become the specification every later layer builds on, and every change to it becomes a new version.
Every plant project begins with questions that are not yet engineering: how much, where, at what cost, under which permits. CapacityIndex turns them into a structured specification covering capacity, scope, economics, localization, permitting and risk, with a business-plan export.
In the bottom-up method this is layer zero, and it is never finished on day one. What the client expects is not always possible, and not always the right assumption. At this stage the conversation with the client never stops: changes to CAPEX and OPEX are decided together with the technical decisions they affect.
Scope evolution is one of the most frustrating parts of an engineer’s work, especially in an industry as tightly coordinated as chemical engineering. It is also unavoidable: much of the work is discovered on the job. So CapacityIndex keeps the scope as a versioned specification. It starts broad and, iteration by iteration, collects the details that describe the business and technical culture of running the plant. Every version stays traceable, and every change travels upwards through the project instead of being patched downstream.
Project progress
A cockpit that tracks the progress of the whole undertaking.
Laboratory procedures
A register of laboratory procedures and quality control.
Funding applications and pitch decks
A builder of funding applications and pitch decks, fed by the project’s data: built on well-designed foundations, transparent to funders and auditable by AI.
Supplier communication and purchasing
Automates communication with suppliers: prepares the emails and tracks quotations, purchases and deliveries.
Permits and legal documentation
Drafts permit applications and legal documentation such as environmental and building permits (drafts, not filings), tracks the legal state and its impact on the project, and keeps the schedule in line with administrative procedures.