← Applications

Layer 4 of the application stack

Architecture

The unit in its site

Georeferenced OpenBIM: terrain from public geospatial data, roads and buildings, IFC and 3D tiles, all the way to the site plan.

The federated BIM model of another project in Architecture: a production hall with photovoltaics on the roof, the staff car park, the truck unloading bay and container storage; the model layers panel lists buildings, structure, foundations, installations, photovoltaics and vehicles.

What it does

Architecture places the unit in the plant that will host it. Terrain comes from public geospatial data, existing roads and buildings are modelled around it, and the result is exchanged as IFC and 3D tiles.

The site plan is drawn by the platform’s own renderer from the same model, with hatched traffic and storage zones and the underground networks, so the drawing and the 3D scene cannot drift apart.

Project responsibilities

From the demo project

Coming soon